Wessex Water & Kingcombe Aquacare – working together for all of us

Kingcombe Aquacare Ltd are proud to be framework contractors for Wessex Water Services Ltd. We have built up a good relationship based on trust, reliability and understanding the needs of our client.

We have been involved in a range of projects, including the relining of final settlement lagoons, the repair and prevention of erosion, specialist fabrication design, and environmental project control.

Final Settlement Lagoons

Final settlement lagoons are found at many sewage treatment sites and are used to impound the water from the treatment process before it is released in to a watercourse. This is to allow any remaining sediment to settle out to ensure that the cleanest possible water is allowed to enter our streams and rivers.

We have been asked by Wessex Water to carry out lining works to several final settlement lagoons. We have installed Firestone EPDM liners to these lagoons to improve the integrity and extend the lives of these valuable assets.

1
Installing Firestone EPDM as a liner in a final settlement lagoon

Erosion repair/protection

The wet weather and high flows experienced in recent years have caused many stream and river banks to suffer accelerated erosion. Several Wessex Water outfalls have been affected with the river cutting away the banks around the asset and we have been called in to carry out repairs.

2
Eroded bank adjacent to a treated water outfall – before…
3
….and after “soft” engineering repair, using growing material to stabilise and reinforce the bank
4
Because of the speed of the water we also have to use “hard” repairs. In this situation we have installed a 3m high rock gabion wall to protect the lagoons from the flow of water which was eroding the outside of the bend.

Environmental Works

We also get involved with environmental works for WW such as permit applications, surveys and monitoring. We were asked to monitor the controlled drain down of a small reservoir recently. This involved measuring and recording the dissolved oxygen and turbidity levels, fish containment and maintaining a watch over the general fish health. We are pleased to announce that no fish were hurt in the undertaking of these works!

5&6
Electrofishing the outlet channel after a controlled reservoir draindown

To view our full list of services please see http://kingcombe.com/water-maintenance-services/

Work in Progress

2017 has got off to a good start with projects underway around the country.

We are working in East Sussex on a splashpad as part of a leisure park development. The site is at Camber Sands near Rye, and is a new feature being installed as part of the redevelopment of the holiday park. So far we have experienced torrential rain and freezing temperatures but the project is moving on. One of the quirks of working on sites like these is that the client provides the accommodation and the site teams end up staying in the park mobile homes. Whilst these are great for family holidays in the summer months I am told they get a bit chilly when the temperature outside is minus 5 degrees C.

At the other end of the country we are working on a very similar scheme at Stibb near Bude in Cornwall. Another splashpad development on a holiday park but here we are working very closely with the Main Contractor who is building the control and plant room next to the splashpad.

These projects are running to strict timescales to allow the work on the surrounding areas to be finished before the parks reopen and take holiday bookings.

Sandymouth Splash Pad 2

In complete contrast we have just started building a 6m deep pumping station and associated valve chamber with ancillary works on a sewage works for Wessex Water. The site is about 10 miles from our offices, so gets lots of visits from everyone. It also means that everyone gets home at night.

We are also involved in work for a government agency along the sides of the River Severn within site of the Severn Bridge. This must rate as one of the most bleak and cold places in the South of England. When the wind is blowing up the estuary bringing rain from the Atlantic it is not a pleasant place to be.

After
Handrail fabricated in our workshop

The winter maintenance of the weedcutting boats is underway and fabrication of platforms, structures and stairways is keeping the workshops gainfully employed.

Despite the cold and recently wet weather everyone is cheerful and looking forward to the advent of spring, longer days and hopefully better conditions to work in.

To see the wide range of services we offer please visit http://kingcombe.com/water-maintenance-services/