Wessex Water & Kingcombe Aquacare – working together for all of us

Kingcombe Aquacare Ltd are proud to be framework contractors for Wessex Water Services Ltd. We have built up a good relationship based on trust, reliability and understanding the needs of our client.

We have been involved in a range of projects, including the relining of final settlement lagoons, the repair and prevention of erosion, specialist fabrication design, and environmental project control.

Final Settlement Lagoons

Final settlement lagoons are found at many sewage treatment sites and are used to impound the water from the treatment process before it is released in to a watercourse. This is to allow any remaining sediment to settle out to ensure that the cleanest possible water is allowed to enter our streams and rivers.

We have been asked by Wessex Water to carry out lining works to several final settlement lagoons. We have installed Firestone EPDM liners to these lagoons to improve the integrity and extend the lives of these valuable assets.

1
Installing Firestone EPDM as a liner in a final settlement lagoon

Erosion repair/protection

The wet weather and high flows experienced in recent years have caused many stream and river banks to suffer accelerated erosion. Several Wessex Water outfalls have been affected with the river cutting away the banks around the asset and we have been called in to carry out repairs.

2
Eroded bank adjacent to a treated water outfall – before…
3
….and after “soft” engineering repair, using growing material to stabilise and reinforce the bank
4
Because of the speed of the water we also have to use “hard” repairs. In this situation we have installed a 3m high rock gabion wall to protect the lagoons from the flow of water which was eroding the outside of the bend.

Environmental Works

We also get involved with environmental works for WW such as permit applications, surveys and monitoring. We were asked to monitor the controlled drain down of a small reservoir recently. This involved measuring and recording the dissolved oxygen and turbidity levels, fish containment and maintaining a watch over the general fish health. We are pleased to announce that no fish were hurt in the undertaking of these works!

5&6
Electrofishing the outlet channel after a controlled reservoir draindown

To view our full list of services please see http://kingcombe.com/water-maintenance-services/

Job Opportunity in our Maintenance Division

We are a National Company based in Somerset, specialising in the Construction and Management of Water for Landscapes, Fisheries, Leisure and Conservation.

An exciting opportunity has arisen in our

Maintenance Division

To carry out regular maintenance tasks for a wide range of water features on both commercial and private properties. The work is likely to include operating specialist machinery, weed cutting and control, herbicide application, seine netting, electro-fishing, fish transportation, planting, bank revetment and maintenance, liner installation and repairs as well as larger construction projects.

To be considered for the role you will have the following skills:

  • Relevant grounds or water maintenance experience a distinct advantage.
  • Hold a current CSCS card and relevant training certificates.
  • Able to establish good working relationships with clients, agents & sub-contractors.
  • Hold a clean driving licence and must be willing to travel nationally.

Benefits for this role include a competitive salary & working away allowances.

This position is based in Bristol.

For an application form call Kelly Eglon 01460 279200

Closing date:  24th February 2017

Kingcombe Aquacare Limited

An Equal Opportunities Employer

An ISO Quality 9001, ISO Environmental 14001, OHSAS 18001 Accredited Company

Tel: 01460 279200

1987-2017

Happy New Year to all of our clients, staff and suppliers at the start of 2017, which is our 30th anniversary year of service to the environment.

Without your support we would never have achieved all that we have done over those 30 years. As we reach this significant milestone, it is wholly appropriate that we should take time out to thank you all for your individual contributions, in so many ways, to our success.hrh

First of all to our suppliers. Despite the modern world demanding that our commercial relationships have to be wrapped up in ever increasing contractual paperwork, those relationships still remain founded on a bond of mutual trust and respect. You have worked hard over the years to provide us with the resources to do our work, for which you can rightly expect to be paid in a timely fashion. We hope that we have always achieved that. Those old fashioned values have remained at the core of our business, helping us to survive some pretty turbulent economic conditions over the years.

woodperry-wheel-barrier-web

Then to our staff. One of the greatest joys has been to see how many of our staff have grown up within the business, developing their skills and experience in the process. Only this week we celebrated another member of staff reaching his 20th anniversary with the company. It is impossible to place a value on the knowledge accumulated over those years, but for certain it ensures we can offer our clients a healthy mixture of mature experience and youthful enthusiasm to overcome the challenges with which they present us. We are only as good as the staff that we employ, and we thank them all for their loyalty, their hard work and their good humour over the years.

And finally, and most importantly, to our clients. Without you, there would be no business. You have continued to present us with new and exciting challenges, which I hope that we have always strived to overcome. One of our proudest moments was to be awarded the Environment Agency’s Project Excellence Award in 2013, for the innovative design and installation of a simple eel pass. In the absence of any external power source, this relies upon miniature ram pumps to provide a suitable flow of water for the elvers to swim up. Working in close collaboration with our clients in this way is so rewarding, especially if the environment is the beneficiary of our mutual efforts.

It is a particular source of reassurance to me that over 70% of our orders come from our existing client base. Many of our regular maintenance contracts extend back well over a decade or more, demonstrating the faith that you have in our staff and the quality of the work that we do. Working in the demanding water environment, we cannot claim that everything goes according to plan every time, but our ethos is always to go that extra mile if necessary to get it right in the end.

willow-spiling-faggots-ea-upper-woodford-1

frozen-fountains

We would encourage you to take a few minutes to browse our website, view our various videos and see the full range of services that we can now offer. Kingcombe Aquacare Services We have certainly come a long way over the last 30 years and we unreservedly say thank you to all of our clients, commercial, private, Local Authority and Agency, for the trust that you have put in us and for encouraging us to grow over those years. We will never take that trust for granted.

So please join us in raising a toast to the next 30 years of Kingcombe Aquacare’s continuing service to the environment.

Fish and Eel Pass

Improving Eel and Fish Passage

An example of success achieved by good design, strong partnership working and experienced installation teams.

We have recently completed another eel pass and fish baffle installation for the Environment Agency, this time in Frampton Cotterell, on the Bristol Frome in Gloucestershire.

Working very closely with the Environment Agency project manager, Gareth Varney, and Fisheries Officer Jody Armitage, we installed one of our jointly designed cassette type eel and elver pass systems on an existing weir, to help improve eel migration. The recycled plastic fish baffles were installed on the concrete weir face to improve the ease of passage for trout and coarse fish.  Both systems were designed to minimise the impact on flow measurement accuracy of the weir and on flood warning capability.

Water level was higher than expected so conditions were challenging but not insurmountable. Our site team were able to manage the water effectively by deploying sand bags and flow deflectors to divert it away from the works area. This facilitated the installation of fish baffles and the eel pass, while maintaining constant water flow downstream.

Eel Pass Tiles

Our work was completed safely, on time and to budget. Gareth Varney, Environment Agency Hydrometry & Telemetry Programme Manager commented;

“We are delighted with the new eel pass installed by the Kingcombe team. They were able to complete the installation under challenging conditions but despite this the end product is perfect. It has not compromised the operation of our existing weir and has hopefully improved migration of fish further up the Frome catchment and should be another positive step in the right direction in the battle to reverse the decline in the European Eel population”